Smart Factory Insights

Field Notes from
the Plant Floor

Practical thinking on WIP visibility, OEE, IIoT architecture and the real work of building smarter factories — written for Ontario manufacturers, not software vendors.

Follow on LinkedIn ↗ New articles every two weeks
Coming up
02
April 21, 2026
Authority

OEE: The Number Every Plant Tracks — and Almost Nobody Calculates Right

Demystifying the most mis-measured KPI in manufacturing, and what accurate OEE actually requires.

03
May 5, 2026
Technical

From Data Chaos to Live Dashboard: How Node-RED Connects Your Shop Floor

A walkthrough of the IIoT data pipeline — from MTConnect and FORCAM APIs to a live Power BI dashboard.

04
May 19, 2026
ROI / Business

The Hidden Cost of Manual WIP Tracking in Ontario Manufacturing

Quantifying what paper-and-scan tracking actually costs — and building the ROI case a plant manager can take to their VP.

05
June 2, 2026
Specialist

FORCAM, Fiix, and the Integration Gap Nobody Talks About

The gap between MES and CMMS is where downtime hides. Here's how IIoT middleware closes it.

06
June 16, 2026
Thought Leadership

Think Big, Start Small, Scale Fast: A Practical Framework for Smart Factory ROI

The CJS methodology as a repeatable engagement model — tying five articles together into a three-phase framework.

Don't Miss the Next One

New articles post every two weeks. Follow CJS on LinkedIn to get notified — or reach out directly if there's a topic you'd like covered.

Follow on LinkedIn → Or get in touch directly →